The Forest Glen Solar Farm is a 113.236MWdc utility scale solar project located in Dubbo, NSW.
The project scope comprised full PV Balance of Plant (BoP) construction, including early works, procurement, logistics, survey, civil works, fencing, piling, single-axis tracker mechanical installation, PV module installation, and DC electrical works. A total of 178,605 modules were installed across the site.
Tranex Power was engaged by Santé Group to deliver the project, coordinating all construction activities across multiple work fronts. Extensive pre-testing and early works were undertaken to assess ground conditions and establish an efficient construction sequence.
This approach enabled consistent productivity throughout the build and supported delivery ahead of programme, with strong alignment between safety, quality, and construction output across the project.





Extensive pre-testing and early works were undertaken to map ground conditions and establish the optimal construction sequence, ensuring predictable productivity from day one. The project was delivered ahead of schedule, with NextPower later noting it was “one of the best-constructed projects” they had seen. This outcome was driven by a highly integrated delivery model between the contractor and TRX Solar, underpinned by daily SIMOPS reviews and jointly developed workfront scheduling - aligning safety, efficiency, and output to achieve consistently high performance across the build.